1

Engineering Services for electrical basic design and Technical document preparation for HV equipment

Al Sader Power Plant Design

H.T.E.P Handelsgeselschaft JLT (UAE)

Iraq

132

2012

E

Handed over

2

Installation, Testing, Commissioning + Supervision and HV test

Al Sader PP 132 kV GIS

Haewa (Germany)/ Alstom (Switzerland)

Iraq

132

2013

C+S

Handed over

3

Algeria 8 x 66kV SS

Design and Engineering

Bayadh2, Boughezul 1&2&3 , Baten  , Laghuat, Zemmouri , El Hamel 2 SS Design

Seaway (Austria)  /Metka (Greece)

Algeria

66

2013

E  

Handed over

4

Algeria 3 x 66 SS

Design and Engineering

AEH, Baraki, Hamma SS Design

Seaway (Austria)  /Metka (Greece)

Algeria

66

2013

E  

Handed over

5

Algeria 400kV-220kV GIS SS

Design and Engineering

TOUGOURT SS Design

Seaway (Austria)  /Metka (Greece)

Algeria

400

2013

E  

Handed over

6

132kV CVT Supply

Al Sader Power Plant CVT Supply

AYSEVEN Co. (Turkey)

Iraq

132

2013

P

Delivered

7

132 kV Porcelain Surge Arrester

Al Sader Power Plant SA Supply

AYSEVEN Co. (Turkey)

Iraq

132

2013

P  

Delivered

8

Supply of Contact Wire Cu-Ag 120MM2 Round Copper Wire

Mashhad OCS Supply

Mashhad Urban

Iran

-

2013/ 2014

P

Delivered

9

132 kV Post Insulator

Al Sader Power Plant PI Supply

AYSEVEN Co. (Turkey)

Iraq

132

2013

P

Delivered

10

30MVA Air Core Shunt Reactor

Al Sader SS Shunt Reactor Supply

AYSEVEN Co. (Turkey)

Iraq

132

2013

P  

Delivered

11

30MVA Air Core Shunt Reactor

Dibis Power Plant Shunt Reactor Supply

Sunir

Iraq

132

2013

P  

Delivered

12

ABB Control Equipment

Bandar Imam Petrochemical

BIPC

Iran

-

2013

P

Delivered

13

DC Rectifier Charger

Qom Monorail

Mapna Raili

Iran

0.11

2013

P

Delivered

14

Design and Supply of         Non-Magnetic Steel Structure/Supports and Earthing System

Alsadr Power Plant Steel Structure Supply

FARAB / Ameran Ofogh

Iraq

-

2013

EP

Delivered

15

DC Power System Supply

Bahar DC Supply

Bahar Building

Iran

0.11

2013

EP

Delivered

16

DC Charger System

of HVS 63/20 KV S/S

Tehran Metro Line 3 HVS SS

Mapna Raili

Iran

0.11

2013

EP

Delivered

17

LVAC/DC Aux panels & Chargers and Inverters for RS & LPS Stations

Tehran Metro L3  Substation and AC/DC Supply

Mapna Rail

Iran

0.4,0.11

2013

EP

Delivered

18

Partial Discharge System (PD)

Al Sader SS PD Supply

MOE (Ministry of Electricity)

Iraq

132

2014

P  

Delivered

19

GIS HV TEST KIT

VFSR system

Al Sader SS HV Test Supply

MOE (Ministry of Electricity)

Iraq

132

2014

P  

Delivered

20

Installation, Testing & Commissioning+ Supervision of

Al Sader 400kV GIS Substation

Al Sader Power Plant 400 kV GIS

AYSEVEN Co. (Turkey)

Iraq

400

2014

C+ S

Handed Over

21

Cable Sealing End 132kV Supply

Al Sader SS CSE Supply

MOE (Ministry of Electricity)

Iraq

132

2014

P  

Delivered

22

Laser Shaft Alignment System Supply

KAHAK Wind Power Plant

Mapna MD1

Iran

20

2014

P

Delivered

23

Installation, Test and Commissioning of L3 Power Portion

Tehran Metro L3

Mapna Raili

Iran

20,0.75

2014

EPC

Finished

24

132 kV Post Insulator Supply

Behbahan Power Plant PI Supply

Mapna

Iran

132

2015

P

Delivered

25

Transformer Silicagel Supply

BIPC Petrochemical

BIPC

Iran

-

2015

P

Delivered

26

 Fajr GIS Spare Part

Fajr 132 kV GIS Spare Part Supply

Fajr Petrochemical

Iran

132

2016

P

Delivered

27

Installation of Power Electric System Supply

Tehran Metro Line1-Aftab Station

Notash/Farab

Iran

0.75

2016

C

Finished

28

Installation, Testing & Commissioning+ Supervision of

DIBIS 400kV GIS Substation

DIBIS Power Plant

Sunir

Iraq

400

2016

C+ S

Under Execution

29

Civil Construction, Mechanical & Electrical Utilities Installation, and Testing

Iran Mall- R2M

Paydar Pey Sazeh

Iran

-

2016

EPC

Handed Over

30

Installation of Balance of Shirvan Power Plant

Shirvan Combined Cycle Power Plant

Mapna MD1

Iran

20,0.75

2016

PC

Handed over

31

Installation of 400KV Substation

Parand Combined Cycle Power Plant Substation

Mapna MD1

Iran

400

2016

PC

Handed Over

32

Mashhad Power System Installation

Mashhad-L2 Third Rail Installation

Petro Omran Mahd Saze

Iran

2016

        C

Handed over

33

Civil Construction, Mechanical & Electrical Utilities Installation and Testing

Iran Mall

PR1

Paydar Pey Sazeh

Iran

-

2016

EPC

Handed over

34

Design Installation Of 3*20/0.4kv

Distribution Substations

Iran Mall

Substations

Paydar Pey

Sazeh

Iran

20

2016

EPC

Under Construction

35

Hormoz 230KV Interconnection between Substation & Power Plant

Hormoz Power Plant Interconnection

GIC International GmbH/ Germany

Iran

230

2017

EPC

Handed Over

36

Purchase Contract for Transition Seal Covering Taxi Way

Iran Mall- Expansion Join Supply

Alborz Tat

Iran

2017

EPC

Under Execution

37

Civil Construction, Mechanical & Electrical Utilities Installation and Testing

Mashhad Mall

Paydar Pey Sazeh

Iran

2017

EPC

Handed over

38

Installation of Electric Power Supply System

Tehran Metro Line 7

Notash/Farab

Iran

0.75

2017

C

Handed Over

39

Installation of 132 kV,2*70 MVAR Harmonic Fitter System as well as Civil Work at AL Mahdi corporation

AL Mahdi Filter Installation

Maschinenfabrk Reinhausen GmbH (MR)/ Germany

Iran

132

2017

EPC

Handed over

40

Basic and detail design and Engineering of Rohina Steel factory 400Kv s/s

Rohina SS Design

Rohina Steel Company

Iran

400

2017

E

Finished

41

Compensation System Test and Commissioning of Azaran Iron Factory

Azaran Iron Test

Sencse/Maschinenfabrk Reinhausen GmbH (MR)/ Germany

Iran

-

2017

C

Handed Over

42

Engineering, Supply and Installation of DCS and Communication System

Lamerd Combined Cycle Power Plant

Shanghaei Electric/China

Iran

400

2018

EPC

Under Construction

43

Mashhad Power System Installation (Part 2)

Mashhad-L2 Third Rail Installation

Petro Omran Mahd Saze

Iran

2019

        C

Handed over

44

Supply of Cable Sealing Ends

Bid Boland 132 kV GIS Substation

SSCO.

Iran

132

2019

P

Delivered

45

Installation, Testing & Commissioning+ of Bidboland 132 kv GIS substation

Bid Boland 132 kV GIS Substation

SSCO.

Iran

132

2019

C

Handed Over

46

Design and Supply of Communication system

Khalij, Bandar Abas and Bandar Pohl 230 kV substations

SSCO.

Iran

230

2019

EPC

Under Execution

47

Supply of Cable Sealing Ends

Sungun, 72.5 and 36 kV Cable Sealing End supply

SSCO.

Iran

63

2019

S

Under Execution

48

Design, Supply, Installation, Testing and Commissioning of BOP panels and DCS system at Dibis Power Plant

Dibis Power Plant, BOP panels and Power Plant DCS system

MOE

Iraq

12 and 0.4

2019

EPC

Under Execution

49

Installation, Testing & Commissioning of Khalij 230/63 kv GIS substation

Khalij 230/63 kV GIS Substation

SSCO.

Iran

230, 63 kV

2020

C

Under Execution